Mini Biogas Plant v1.1 – FS22
Changelog 1.1.0.0:
– Electricity and Methane can now be stored,distributed or sold
– Edited silage and straw production recipes to generate more methane
– Added a version of the mini BGA with an electricity charging point and methane filling point
– Added a small electricity charging and methane filling point, to use this set the Electricity and/or Methane in the BGA to distributing
– Added a large electricity charging amd methane filling point, to use this set the Electricity and/or Methane in the BGA to distributing. This can also store 1,000,000 units of electricity and methane for future selling or distribution to generators from the modular BGA
Mini Biogas Plant with and without charging stations
Price: £55,000
Maintenance costs: £55/day
Inputs:
Silage 75,000 L
Manure 75,000 L
Slurry 75,000 L
Chopped Sugarbeet 36,000 L
Sugarbeet 36,000 L
Potatoes 36,000 L
straw 75,000 L
Outputs:
Electric Charge 100,000 KW
Methane 100,000 L
Digestate 1,000,000 L
Refueling Station
Price: £55,000
Maintenance costs: £20/day
Capacity
Electric Charge 1,000,000 KW
Methane 1,000,000 L
Small Refueling Station
Price: £55,000
Maintenance costs: £20/day
Capacity
Electric Charge 1,000 KW
Methane 1,000 L
Bales and loose silage and straw accepted.
Compatible with the modular BGA